Cost database: plant

Plant rates are hire prices for machines, usually per hour or per day.

Open Plant rates. Add a machine, its unit and its hire rate.

On a takeoff assembly or a bill buildup, link the plant row and set per unit to how long you need it for one unit of the material line.

Examples

  • Mini excavator

    Plant: 1.5 t excavator. Unit: hour. Rate: 38.0000. On excavation, per unit 0.250000 means a quarter of an hour of the machine per m³.

Ask about this

The assistant uses this guide only. It cannot see your projects.